Approval of Minutes: June 20, 2023
01:09Bow Lane Next Gen, LLC and 206 NH Route 101, LLC
04:59Request for a variance from Article III, Section 275-22A, Table 1, Table of Dimensional Regulations, to allow the construction of a retaining wall greater than 6 feet in height, within 0 to 20 feet of the front setback where 60 feet is required, at 206 NH Route 101, Lots 20-22-14 and 20-22-14-1, Zoned CO. [Continued from the June 20, 2023 ZBA meeting.]
Bow Lane Next Gen, LLC and 206 NH Route 101, LLC
01:37:25Request for a variance from Article IV, Section 275-28A to allow the construction of a retaining wall greater than 6 feet in height within 2 to 20 feet of the edge of Wetland #2 and construction of an underground vault within 20 feet of the edge of Wetland #2 where 50 feet is required, at 206 NH Route 101, Lots 20-22-14 and 20-22-14-1, Zoned CO. [Continued from the June 20, 2023 ZBA meeting.]
Bow Lane Next Gen, LLC and 206 NH Route 101, LLC
01:58:41Request for a variance from Article IV, Section 275-28A to allow the construction of a retaining wall greater than 6 feet in height within 26 to 40 feet of the edge of Wetland #1 (Riddle Brook) and construction of an underground vault within the 10 feet of the edge of Wetland #1 where 50 feet is required, at 206 NH Route 101, Lots 20-22-14 and 20-22-14-1, Zoned CO. [Continued from the June 20, 2023 ZBA meeting.]